Plan ahead for roofs, parking lots & major repairs

Build a 5-, 10- or 30-year repair budget. Enter your reserve balance, contributions and project estimates to see year-by-year balances and the monthly reserve amount per home needed to meet your chosen year-end minimum.

This is an illustrative cash-flow budget, not a professional reserve study, engineering inspection or an approved assessment. Use contractor estimates and an association-specific reserve study to set costs and timing.

1. Association reserve assumptions
Year 1 is the next 12 months. Later years follow consecutively.
Number of homes or lots; equal shares are assumed.
Available reserve funds today.
Total contributed by the association each year, not per home.
Optional; blank = 0. Applies to costs from today to the project year.
Optional; blank = 0. Applied only to positive beginning-of-year reserves.
Optional buffer; blank = 0. This is your chosen target.

2. Repair and replacement projects

Use one row per roof, parking area or other component. Enter the first year it needs work. Add a repeat interval for recurring items such as sealcoating; leave it blank for a one-time replacement. Unused rows can stay blank.

How does the reserve-budget calculation work?

Each project cost = today’s estimate × (1 + annual inflation) raised to its project year. Year 1 assumes one year of inflation. A repeated project occurs again at the interval you enter, with inflation applied to each occurrence. Projects outside the selected horizon are excluded.

For each year: ending reserves = beginning reserves + constant annual contribution + interest − scheduled project costs. Interest uses only a positive beginning balance. Negative balances show unmet funding needs; no loan, borrowing costs or interest earnings on a shortfall are assumed.

The calculated funding scenario solves for a constant annual contribution that meets your chosen minimum at every year-end. Monthly reserve contribution per home = annual contribution ÷ 12 ÷ homes. Contributions are shared equally here; your governing documents may require a different allocation.

This annual model assumes the full annual contribution is available before year-end project spending. It does not test cash available on the actual payment date. Earlier repairs may need an immediate assessment or a different deposit schedule. The buffer is a year-end target, not an assurance of adequate reserves at all times.

Which expenses belong in the plan?

Include association-responsible major repairs and replacements such as roofing, pavement resurfacing, sealcoating, drainage, siding, fencing or equipment. Separate routine operating expenses from reserve projects. Use current bids and professional condition assessments instead of assumed roof or pavement lifespans.

A 5- or 10-year plan helps review near-term cash needs but can miss later replacements. Try the 30-year view and include future cycles to see beyond the next major project. This planner does not calculate percent funded or certify reserve adequacy.

For the scope of a professional reserve study, see the Community Associations Institute Reserve Study Standards.

Are my association’s numbers stored?

The calculator does not send or save your entries, connect to association accounts, or prefill financial records. Reloading or clearing removes your working numbers. If you choose to print or save a PDF, that copy is under your control.